Client results · Case studies

The work behind the claims.

Real examples of completed business energy work — from capacity reviews and metering to supplier disputes, tenancy corrections and more complex account problems.

We publish the evidence that matters: what was wrong, what we reviewed, what changed and how the result was calculated. Client identities stay private unless we have explicit permission to name them.

  • Completed client work
  • Source-backed results
  • Anonymous by default
01 Evidence first

A result should be provable.

These are not invented marketing stories. Each case is built from completed work and the records behind it — such as DNO data, supplier correspondence, bills, meter information or contract documentation.

01

Start with the problem.

What the client was being charged for, what had gone wrong, or what looked out of line with the way the site was actually operating.

02

Show what we checked.

The useful technical detail stays in: demand history, meter class, account liability, billing periods, DNO data, supplier responses and the calculations used.

03

Separate confirmation from calculation.

If a DNO confirms a capacity change, we say that. If the financial saving is calculated from the client's billed rate, we say that too. No blurring the two.

03 The library

Different problems. Same standard of proof.

Each result on this page is a route into a fuller evidence-led case study. The library will grow as completed work is documented; we would rather publish a smaller number of useful cases than fill the site with thin success stories.

01

HH, kVA & capacity

Authorised capacity, maximum demand, LLF/TCR considerations, Half-Hourly metering and Change of Measurement Class.

02

Billing & supplier disputes

Incorrect billing, estimated reads, liability disputes, rebilling, supplier complaints and evidence-led escalation.

03

Change of Tenancy

Occupier changes, account liability, incoming and outgoing responsibility, deemed periods and supplier corrections.

04

Metering & connections

Meter changes, upgrades, site changes, technical corrections and cases where the metering setup no longer suits the business.

05

Procurement & multi-site

Contract strategy, market timing, renewal decisions and work where multiple sites or supply points need to be managed together.

Commercial confidentiality

The result is public. The client isn't.

Most client results are anonymised. That protects the businesses we work for and keeps commercially sensitive information out of the public domain without stripping the technical value out of the case.

No client name without explicit permission. A business is not identified simply because its result makes a good case study.
No MPANs, contact details or unnecessary site identifiers. Only the information needed to understand the technical problem and outcome is published.
Enough detail to understand how the result was reached. Anonymised does not mean vague: the evidence, method, figures and relevant market or network context remain.
05 Your account

Think there may be something we're missing?

Send us the bill, contract or supplier correspondence and we'll tell you what is worth looking at — whether that is price, capacity, metering, liability or a supplier problem.